A Novel Surrogate Polytope Method For Day-Ahead Virtual Power Plant Scheduling With Joint Probabilistic Constraints

Virtual Power Plant (VPP) is an emerging concept that can effectively manage a large number of distributed energy resources (DERs). However, the inherent uncertainty of load and renewable generation poses a challenge to reliable VPP power scheduling. This manuscript proposes a novel method for day-ahead VPP scheduling with a joint probabilistic guarantee on its power availability without violating the DER constraints and network constraints. A surrogate polytope is first used to find the inner approximation of the VPP power, implicitly including the low-level DER power, DER constraints, and network constraints. Then, a multivariate Gaussian distribution is used to fit the random parameters of the surrogate polytope, after which the iterative supporting hyperplane algorithm is used to solve the VPP scheduling problem. Extensive case studies based on real-world renewable generation scenarios demonstrate the superior performance of the proposed method in out-of-sample cost and reliability, with a manageable computing complexity.

Yihong Zhou
School of Engineering, The University of Edinburgh
United Kingdom

Chaimaa Essayeh
School of Engineering, The University of Edinburgh
United Kingdom

Thomas Morstyn
School of Engineering, The University of Edinburgh
United Kingdom

 